Forgevena v1.0–v1.4 Completion Matrix

Verified: 2026-08-02
Rule: Historical outcomes are immutable. Current governance is applied prospectively and never upgrades an older release's assurance claim.

Version or milestone Immutable release status Implementation status Evidence decision
v1.0.0 No repository tag Historical product milestone recorded in changelog and release notes Do not represent as a published or currently certified release
v1.1.0 No repository tag Historical architecture and capability milestone Do not fabricate a tag, package, or retrospective certification
v1.2.0 Immutable failed publication tag Release preparation completed; publication failed Preserve failure record; superseded by v1.2.1
v1.2.1 Published historical assurance Cross-platform release and documentation repairs shipped Complete under its release-era controls
v1.2.2 Immutable failed publication tag Distribution hardening was attempted; publication failed Preserve failure record; superseded by v1.2.3
v1.2.3 Published historical assurance Native packages and standalone distribution shipped Complete under its release-era controls
v1.3.0 Published historical assurance E1 reliability and security foundation shipped Complete; immutable evidence reconciled
v1.4.0 Signed v1.4.0-rc.3 prerelease published; no stable tag Provider platform and credential-slot work merged through PR #55 Stable Release HOLD pending live-provider evidence, exact-RC3 lifecycle rehearsal, release scorecard, approval, and stable channel verification

Canonical Evidence

Completion Rule

“Implementation complete” means all repository-controlled behavior, tests, schemas, documentation, and local evidence are complete. “Release complete” additionally requires hosted cross-platform checks, required external-account evidence, an approved release candidate, signed immutable publication, and post-release verification. These states must never be conflated.